Developer meeting minutes: 2009-07-14
- Equinox support is in place; ACTION: Dan to forward Equinox support instructions to rest of people
- Developer brain-dump meeting will be held 2009-07-29 / 2009-07-30 at Algoma University; ACTION: Dan to forward Sault hotel details to Art
- ACTION: Art and Robin to let Dan know if they want 23:59 modification to due date / times
- ACTION: Robin to give the in-database circ rules a shake (although there might be a problem seeing the circ libraries in the "new circ rule" interface)
- ACTION: Art to write up some description of the receiving and invoicing requirements for Bill
- ACTION: Robin hopes to have an interface for database / e-book / journal license management ready for end of July; and then build on Django with OpenSRF
Reserves
- Art hitting day one of Reserves - will give an install on comet a go to match the Windows environment and test out the interaction
- SIP connection - if running reserves or self-check machine on local campus, port forward to a local campus machine protected by iptables rules and connect to that to avoid shipping transactions in plain text over the 'net
- ACTION: Dan to get reserves interface translated into French
nginx proxying to stop consuming static Apache processes
- ACTION: someone needs to test and document, this could be handy for reserves as well
Making Google Books lookup call asynchronous
- ACTION: Robin to check to see if the Google script is in the <head> element
OPAC enhancements
- Internet Explorer is dying on advanced BibTemplate? stuff, which is bad for subjects and online resources and many of the enhancements we need
- This is a show-stopper for a 1.6 release
- Dan backported "Export to RefWorks?" functionality to comet / rel_1_6
- LibX toolbar - Dan created one for Laurentian University that works against Conifer, feel free to copy and modify
Miscellaneous pressing needs
- ACTION: Dan to create the remaining circ duration rules for OWA / OWAL
- ACTION: Dan to call for project planning meeting - next week?
Patron loading
- Art has been trying to follow up with Grant on the registrar update process UPEI is using, but Grant doesn't seem to have a firm grip on the details
- Dan has been trying to kickstart a simplified version of a once-per-semester load at Laurentian, but next meeting of the committee that decides this won't happen until late September
Last modified 14 years ago
Last modified on Jul 14, 2009, 11:17:52 AM